Planning and managing material and human resources (GANTT)
Dashboard and monitoring
The project leader's role and communication with the team
Developed material
What this material enables
Frame a project, estimate without systematic optimism, steer it on a small number of indicators, and know when to stop it.
Material developed by NAITECH Consult from the works cited. It complements the published course outline without replacing it, and awaits review by a subject-matter trainer before recording.
Chapter 1
What the standards say, and what they do not
Material reserved. The detail of this chapter — what it establishes and the points developed — is reserved for enrolled participants whose payment has been recorded.
Material reserved. The detail of this chapter — what it establishes and the points developed — is reserved for enrolled participants whose payment has been recorded.
Material reserved. The detail of this chapter — what it establishes and the points developed — is reserved for enrolled participants whose payment has been recorded.
Material reserved. The detail of this chapter — what it establishes and the points developed — is reserved for enrolled participants whose payment has been recorded.
Several of the models taught in this subject are debated, or contradicted by more recent work. The points below are stated rather than passed over.
—No standard has demonstrated, by controlled comparison, that it raises project success rates: they codify practices, they do not prove them.
—Comparisons between agile and stage-gate delivery are confounded by project type: the projects given to one do not resemble those given to the other.
—The widely quoted project failure rates come from consultancy surveys whose method is unpublished; the order of magnitude is plausible, the figure unverifiable.
Works cited
[1] Organisation internationale de normalisation (2020), ISO 21502 — Management de projet, de programme et de portefeuille : recommandations sur le management de projet — ISO
[2] Project Management Institute (2021), A Guide to the Project Management Body of Knowledge (PMBOK Guide), 7ᵉ édition — PMI
[4] Flyvbjerg, B., Skamris Holm, M. K. & Buhl, S. L. (2002), Underestimating costs in public works projects: Error or lie? — Journal of the American Planning Association
[5] Flyvbjerg, B. (2006), From Nobel Prize to project management: Getting risks right — Project Management Journal
[6] Kahneman, D. & Tversky, A. (1979), Intuitive prediction: Biases and corrective procedures — TIMS Studies in the Management Sciences