Skip to content
NAITECH ConsultNorth African Institution of Technology Consulting
Be reasonable, please!Ask us for the impossible!

Area of expertise

Management consulting

Advisory and capacity building — Processes · Change · Risk · Service quality

Organizational diagnosis, process redesign, change management, risk mapping. We work with the teams concerned, never above them: a reorganization designed behind closed doors does not survive its first quarter.

Typical duration
6 to 12 weeks for a full diagnosis
Main deliverable
Process map + action plan
Counterparts
Senior management, middle management
Handover
Change support included

The problem

A redrawn org chart changes nothing about the blockages.

A reorganization often ends in a new org chart and the same blockages. The boxes have changed shape; the file that used to sit fifteen days in one department still sits fifteen in the next. Because an org chart describes a hierarchy, not a process — and it is processes that produce, or fail to produce, what the client expects.

The symptom shows in a sentence that recurs in almost every diagnosis: "it is nobody’s fault, but nobody is responsible either". A breaking point rarely exists because of a person; it exists because no one is explicitly in charge of it.

These situations have a common cause: change is decided on the visible structure — the posts, the titles — before mapping the invisible structure — who decides what, with what information, within what time. It is this second map we build first.

An org chart says who reports to whom. It never says who decides, or with what information. These are two different maps, and the second matters more.

Warning sign

If the same malfunction recurs in successive diagnoses under different names, the problem is not in the posts being renamed: it is in the process that is never mapped.

The intervention cycle

Seven steps, two of them specific to this domain.

The two dashed steps vary by domain; the other five are common to all six chains.

  1. Understand
  2. Assess
  3. Consolidate
  4. Design
  5. Structure
  6. Support
  7. Deploy

Fields of application

Where this domain works in practice.

  • Strategy & organization

    Mandates, macro-structure, resource allocation and evolution scenarios.

  • Processes & procedures

    Mapping, simplification of circuits, procedure manuals and internal control.

  • Performance steering

    Objectives, indicators, dashboards and performance reviews.

  • Human capital & management

    Supervision, skills, cooperation and change management.

The competency chain

12 competencies, across two axes and a pivot

Axis 1 establishes and measures. Axis 2 builds. The pivot names the point where one turns into the other.

Axis 1

Organizational diagnosis and performance assessment

Establish how the organization actually works and measure its performance.

  1. 01

    Strategic and organizational diagnosis

    Analysis of mandates, positioning, structure, resource allocation and room for manoeuvre.

  2. 02

    Analysis of processes and ways of working

    Process mapping, identification of breakpoints, redundancies, delays and real workloads.

  3. 03

    Assessment of performance and of the steering system

    Relevance of objectives, quality of indicators, reliability of reporting and actual use of management data.

  4. 04

    Assessment of management practices and the working climate

    Supervision styles, delegation, flow of information, inter-unit cooperation and team engagement.

  5. 05

    Analysis of skills and of the job-resource fit

    Headcount, skills frameworks, workload distribution and gaps between needs and available resources.

  6. 06

    Participatory feedback and consolidation of learning

    Workshops to share the diagnosis, joint ranking of priorities and conversion of findings into methodological assets.

Pivot — from the shared finding to the target organization

Axis 2

Engineering of transformation and change management

Turn the diagnosis into a target organization and lasting internal capacity.

  1. 07

    Formulation of orientations and the target design

    Translation of priorities into strategic objectives, construction and arbitration of organization scenarios.

  2. 08

    Organizational modeling and macro-structure

    Target org chart, unit mandates, role descriptions, articulation of decision and responsibility levels.

  3. 09

    Re-engineering of processes and procedures

    Simplification of circuits, procedure manuals, signature delegations and internal control points.

  4. 10

    Design of the performance steering system

    Objectives contract, indicators, dashboards and cadence of performance reviews.

  5. 11

    Change support and managerial development

    Internal communication plan, action-learning for managers and close support to leadership teams.

  6. 12

    Implementation roadmap and skills transfer

    Sequencing of work streams, milestones, resources, success conditions and internal ownership.

Our services

Six services, from diagnosis to embedding change.

A reorganization without support returns to its starting point in eighteen months. Support is not an end-of-mission option; it is part of the work.

  1. 01

    Organizational diagnosis

    Structure, processes, workload and breaking points, established by observation and not by declaration.

    • Structured interviews at every level
    • Direct observation of decision circuits
    • Workload mapping by department
    • Findings put to challenge before conclusion
  2. 02

    Process redesign

    Mapping of existing processes, simplification, target procedures written with those who carry them out.

    • AS-IS then TO-BE mapping
    • Elimination of non-value steps
    • Procedures written with the operators
    • Monitoring indicators by process
  3. 03

    Change management

    Support for stakeholders, internal communication plan, embedding of new practices over time.

    • Mapping of stakeholders and resistance
    • Sequenced internal communication plan
    • Support for line managers
    • Measurement of embedding at six months
  4. 04

    Risk mapping

    Identification and rating of operational and social risks, control plans entrusted to internal teams.

    • Identification workshops by process
    • Probability / impact rating
    • Assigned and dated control plans
    • A periodic review arrangement
  5. 05

    Service quality

    User or customer journey, service standards, front-office arrangements built on the real reasons for dissatisfaction.

    • User journey mapping
    • Measurable service standards
    • A complaint-handling arrangement
    • Training of customer-facing teams
  6. 06

    Organizational audit

    Assessment of the gaps between the prescribed organization and the real one, ranked recommendations and an action plan.

    • Comparison of prescribed / real organization
    • Gaps ranked by impact
    • Dated and assigned action plan
    • Review at three and six months

Typical deliverables

What appears in a proposal — a document, not an intention.

Every deliverable is handed over in an editable format, with its documentation. You are never dependent on the firm to keep it up to date.

  • Diagnosis report
  • Process map
  • Change management plan
  • Risk map
  • Service quality standards
  • Audit action plan

An example

Industrial company — risk mapping.

The situation
An industrial company facing recurring incidents with no consolidated view of their causes, nor of its real exposure to operational and social risk.
What we did
Identification workshops by process with field and management teams, shared risk rating, construction of the control plans with the managers concerned.
What was delivered
A rated and prioritized risk register, assigned and dated control plans, and a quarterly review arrangement handed to the management committee.
What stayed
The management committee reviews the register every quarter with no external support. It has become a standing item on its agenda.

A real engagement, presented by sector. The client name is given as a reference in tender submissions, with their written consent.

Timelines and conditions

What to plan for on your side.

Duration. A full organizational diagnosis takes 6 to 10 weeks depending on the size of the organization. The process redesign and change support that follow generally run two to four additional months.

Internal availability. Direct field access conditions the quality of the diagnosis: a consultant who only observes management meetings produces a diagnosis of management meetings. Plan for unfiltered access to the teams concerned, including outside the usual hierarchical channels.

Success conditions. A sponsor at senior-management level, able to settle cross-department trade-offs; clear communication to the teams about the real purpose of the engagement, to avoid restructuring rumours; and acceptance that some findings displease before they help.

What we refuse. Producing a diagnosis whose conclusions are fixed before the field observation. A diagnosis commissioned to confirm a decision already taken has no diagnostic value; we say so before starting, not after invoicing.

Cost

The price depends on the number of consultant-days, not on the size of your organization. We state the daily rate, the number of days per step and what each step produces. The framing consultation is free.

References for this domain

The organizations that trust us.

32 organizations supported, across every sector.

  • TOURBA

    TOURBA

  • Mediouna Services S.A — شركة التنمية مديونة خدمات ش.م

    Mediouna Services S.A — شركة التنمية مديونة خدمات ش.م

  • Ministère de l'Équipement et du Transport — Royaume du Maroc

    Ministère de l'Équipement et du Transport — Royaume du Maroc

  • Ministère de la Fonction Publique et de la Modernisation de l'Administration

    Ministère de la Fonction Publique et de la Modernisation de l'Administration

  • Ministère de l'Habitat, de l'Urbanisme et de la Politique de la Ville

    Ministère de l'Habitat, de l'Urbanisme et de la Politique de la Ville

  • Conseil National des Droits de l'Homme (CNDH)

    Conseil National des Droits de l'Homme (CNDH)

  • Agence Nationale pour le Développement de l'Aquaculture (ANDA)

    Agence Nationale pour le Développement de l'Aquaculture (ANDA)

  • Zoo de Rabat

    Zoo de Rabat

  • District Autonome d'Abidjan

    District Autonome d'Abidjan

  • UNESCO

    UNESCO

  • Coopération allemande — Deutsche Zusammenarbeit (GIZ)

    Coopération allemande — Deutsche Zusammenarbeit (GIZ)

  • BTC–CTB, Belgian Development Agency

    BTC–CTB, Belgian Development Agency

  • FDFP — Fonds de Développement de la Formation Professionnelle (Côte d'Ivoire)

    FDFP — Fonds de Développement de la Formation Professionnelle (Côte d'Ivoire)

  • Institut Français Casablanca

    Institut Français Casablanca

  • Campus Veolia Environnement

    Campus Veolia Environnement

  • Amendis

    Amendis

  • Redal

    Redal

  • RADEEL — Régie de distribution d'eau et d'électricité, Larache

    RADEEL — Régie de distribution d'eau et d'électricité, Larache

  • TAQA Morocco

    TAQA Morocco

  • JESA

    JESA

  • Webhelp

    Webhelp

  • Philip Morris International

    Philip Morris International

  • SIANA — maintenance des rames à grande vitesse

    SIANA — maintenance des rames à grande vitesse

  • Altadis

    Altadis

  • CFR

    CFR

  • DIRA — Dirafrost

    DIRA — Dirafrost

  • Groupe Maroc Soir

    Groupe Maroc Soir

  • Global Media Strategic Consulting

    Global Media Strategic Consulting

  • Med Radio

    Med Radio

  • Fondation Zakoura

    Fondation Zakoura

  • Zakoura Academy

    Zakoura Academy

  • Fondation Wasl wa Idmaj

    Fondation Wasl wa Idmaj

See all our references

Our tools

Our online tools: Management

Use them here with your own data: a preview of your result appears at once. Only NAITECH Consult receives the detailed reports and complete information.

TOOL 18

Organizational diagnosis

Twenty-four statements on the twelve dimensions of the Burke–Litwin model: the levers of transformation (environment, strategy, leadership, culture) and the levers of day-to-day functioning (structure, management, systems, climate, skills, motivation).

For executive teams, HR directors and transformation leads, in the public and private sectors. Answer according to what you observe today. A preview appears at the end; a full diagnosis surveys a sample of staff.

ContextQuestion 1 / 25

What type of organization are you describing?

Original questionnaire by NAITECH Consult based on W. Warner Burke and George H. Litwin’s causal model of organizational performance and change (Journal of Management, 1992). It is not its authors’ survey instrument.

One respondent’s perception, indicative only: it guides the diagnosis without replacing it. The levers are read together, in light of interviews, documents and a staff survey.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 19

Organizational culture

Six dimensions of culture, four descriptions each: share 100 points among them, for today and for the culture you want.

Before a transformation, a merger or a management project. For each dimension, give the most points to the description closest to reality, then do the same for the culture you want in three to five years. Each column adds up to 100.

Type of organization

Original questionnaire by NAITECH Consult based on the competing values framework (Quinn and Rohrbaugh, 1983; Cameron and Quinn). It is not the OCAI, its authors’ instrument.

Indicative profile based on one person’s answers. No culture is good in itself: the question is its fit with the strategy. A full approach compares the profiles of several groups and adds workshops.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 20

Readiness for change

Ten statements from a published, validated scale, in two parts: commitment to the change and confidence in the ability to implement it.

Think of a specific change your organization must implement, and answer for the people of the unit concerned. A preview appears at the end; to measure the organization’s readiness, NAITECH Consult surveys its members.

ContextQuestion 1 / 12

What type of organization are you describing?

The ORIC scale (Organizational Readiness for Implementing Change) by Shea, Jacobs, Esserman, Bruce and Weiner, Implementation Science, 2014, CC BY 2.0 licence; French version ROIC by Ruest and colleagues, BMC Health Services Research, 2019, CC BY 4.0 licence. Generic wording (« this change ») instead of the clinical setting.

One respondent gives a perception, not the organization’s readiness: that is measured by surveying its members and checking that they agree. The two parts are read separately.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 21

Strategy–structure fit

Your strategy, environment, size and the nature of the work, then your current structure: centralization, formalization, coordination and grouping of units.

Before a reorganization, or when the structure seems to hold the strategy back. Answer for the whole organization or the entity you run. A preview appears at the end.

ContextQuestion 1 / 11

What type of organization are you describing?

Original questionnaire by NAITECH Consult. It draws on Miles and Snow’s strategy typology (1978), structural contingency theory and Burton and Obel’s multi-contingency model, whose misfits have been linked to lower returns (Management Science, 2002).

Indicative reading based on published fit rules and on your answers. An organization can succeed by several routes: the misfits flagged are leads to check, not verdicts.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 22

Spans and layers

For each level of the hierarchy: the headcount, the number of managers and the nature of their work. The tool computes each level’s actual span of control and compares it with what the work supervised allows.

Before a reorganization, a review of management costs or a simplification effort. Count each person once, at the level where they sit; each level reports to the level above.

Type of organization

The spans-and-layers analysis used by organization consultancies; reference ranges by type of management after McKinsey & Company (2017). Research knows no universal optimal span: it depends on the work supervised.

Exact calculation on the headcount entered, assuming each level reports to the one directly above. The reference ranges are practitioner benchmarks, not standards: a span is judged against the actual work, geographic dispersion and the teams’ experience.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 23

Team effectiveness conditions

Eighteen statements on the six conditions that, according to the work of J. Richard Hackman and Ruth Wageman, make a team effective: three essential conditions and three enabling ones.

For a leadership team, a project team or an operational team. Answer for the team as it works today. A preview appears at the end; a full diagnosis has every member answer.

ContextQuestion 1 / 19

Which team are you describing?

Original questionnaire by NAITECH Consult based on Hackman and Wageman’s six-condition model (Leading Teams, 2002; Senior Leadership Teams, 2008). It is not the Team Diagnostic Survey, its authors’ instrument.

One member’s perception, indicative. The conditions reinforce each other: the essential ones come first, when the team is designed and launched.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 24

Objectives-and-means contract

Write an objectives contract where the means are committed opposite.

An objectives-and-means contract is reciprocal: one party commits to results, the other to the means that make them possible. It is the second half that most often disappears. Describe objective by objective what your draft contract writes, and what is committed opposite.

Sector

Public establishment or enterprise, local authority, administration. The tool then checks budget annuality, the supervising authority’s commitment and the applicable financial control.

Level of the contract
The objectives, and the means committed opposite

Means are entered objective by objective, not as one global list: the question is not whether means exist, but which objective receives what.

What the indicator measures

Means committed by the other party for this objective

What the indicator measures

Means committed by the other party for this objective

What the indicator measures

Means committed by the other party for this objective

Total weight : 100 %

Governance of the contract
Public-sector specifics
What becomes of the contract afterwards

This tool examines the FORM of the contract — reciprocity, indicators, governance — not the ambition of its targets: no one can say from outside whether a target is too low, and claiming to do so would invent a judgment. A perfectly reciprocal contract may thus carry pointless objectives; the reverse is equally true. In the public sector, a multi-year commitment of funds remains subject to the annual finance act and to the financial control applicable to the body: the tool checks that the contract addresses this, it does not lift the constraint. Finally, the reciprocity rate is computed on what you declare you have written; it does not read your draft contract.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 25

Segregation of duties

Who does what in purchasing, sales and payroll — and which overlaps open a door.

Write, next to each duty, who holds it — a role, a department or a first name, never a person’s full name. The tool then compares your allocation against a matrix of incompatibilities: the pairs of duties that, gathered in one hand, allow an operation whose trace no one would see. It also computes the minimum number of people your breakdown requires, which is the only useful answer for a small organization.

An activity, never a company name: the tool receives no identity.

The cycles to examine

The five natures of internal control: authorize, hold, record, check, maintain the master file. It is their gathering in one hand that the tool examines.

Purchasing and payments

From choosing the supplier to the cash going out, then to the bank reconciliation.

Maintain the master file · Opening a supplier account, and above all entering or changing its bank details.

Who holds this duty

Authorize · Deciding on the purchase and committing the organization to the supplier.

Who holds this duty

Hold the asset or the cash · Establishing that the goods arrived, or that the service was indeed performed.

Who holds this duty

Record · Posting the invoice to the accounts and queueing it for payment.

Who holds this duty

Hold the asset or the cash · Signing, approving or triggering the transfer, the check or the remittance.

Who holds this duty

Check and reconcile · Matching bank statements against the entries, and explaining the differences.

Who holds this duty

Leave blank if no one holds it.

The compensating controls in place on this cycle

Sales and collections

From opening the customer account to collection, credit notes included.

Maintain the master file · Opening the customer account, setting or raising the authorized exposure.

Who holds this duty

Authorize · Deciding to sell, at what price and on what payment terms.

Who holds this duty

Hold the asset or the cash · Moving the goods out, or performing the service at the customer.

Who holds this duty

Record · Issuing the invoice and posting it to the customer account.

Who holds this duty

Hold the asset or the cash · Receiving the cash, the check or the transfer, and taking it to the bank.

Who holds this duty

Authorize · Canceling an invoice, granting a commercial gesture, giving up on a receivable.

Who holds this duty

Leave blank if no one holds it.

The compensating controls in place on this cycle

Payroll

From entering the employee in the master file to releasing the payroll transfer.

Maintain the master file · Creating the record, entering the base pay and the bank details.

Who holds this duty

Record · Overtime, bonuses, absences, advances.

Who holds this duty

Record · Running the process and producing the payroll journal.

Who holds this duty

Authorize · Settling the amount to be paid after reviewing the payroll report.

Who holds this duty

Hold the asset or the cash · Submitting or signing the transfer file with the bank.

Who holds this duty

Check and reconcile · Reconciling the payroll total against headcount and the accounts, month over month.

Who holds this duty

Leave blank if no one holds it.

The compensating controls in place on this cycle

The allocation and the rights

This tool does NOT detect fraud: it detects overlapping duties, that is, possibilities. An overlap found says nothing about anyone’s honesty, and the vast majority of existing overlaps have never produced anything — they describe an organization in which, if someone wanted to, no one would see it. It reasons on the duties you declare, not on the rights actually open in your systems: a duty declared as held by one person but whose password is shared, or an administrator who can do everything, escapes the matrix entirely. Examining effective rights is separate work. The minimum number of holders it gives is computed on the breakdown of duties used here; a finer breakdown moves that minimum. Finally, a compensating control does not remove an overlap: it shortens the period during which a diversion would stay invisible. That is the reading of the COSO framework, which accepts alternative controls where segregation is not practical, without presenting them as equivalent.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 26

Business impact analysis

How long each activity can stop, and what your plan actually delivers.

Describe your essential activities, and for each one four durations: how long its stoppage is tolerable, how long your plan expects to take to resume it, what data loss you accept, and how often your backups actually run. The tool then checks that these durations can be true at the same time — the step that gets skipped, and the one that makes plans fail on the day they are opened.

An activity, never a company name: the tool receives no identity.

Your information system

Observed, not targeted: the time taken at the last incident or the last exercise. If you have never measured it, take the longest you have lived through.

Your essential activities

It stops if we lose

What its stoppage produces

The resources that have a TRIED fallback

Tick only what has already worked as a replacement. A generator never started, a fallback site never occupied and a backup never restored are not fallbacks.

Your continuity plan

This tool does NOT write your continuity plan: it checks the consistency of the durations a plan is built on, and that is the step most often skipped. A plan built on contradictory durations is a plan that will fail the day it is opened. The durations it examines are the ones you declare. A recovery time announced and never exercised remains an intention: that is why the tool distinguishes throughout what is aimed at from what has been tried, and why ISO 22301 requires an exercise program. Maximum tolerable periods are decided with the business and with management, never by the IT function alone, and an impact touching the safety of people or a legal deadline is not traded off against a cost. Finally, a business impact analysis says nothing about the LIKELIHOOD of incidents: that is risk assessment, separate work the same standard asks for alongside this one.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 27

Risk assessment and management

Your risks, what actually holds them, and what you decided to do about them.

Describe your risks as events: this cause produces this event, which produces this consequence. Rate them on two anchored scales — an observable frequency for likelihood, consequences specific to your sector for impact — then declare the barriers in place and the ones that have been tested. The tool does NOT ask you to rate your own control: it derives it from the barriers, which is the only way to get a residual your management committee can challenge line by line.

Your sector

An activity, never an organization’s name: the tool receives no identity.

Your tolerance threshold

A number on the residual scale, from 1 to 25, not an adjective. This is what ISO 31000 calls a risk criterion: above it, a risk calls for a decision; below it, a risk is monitored.

8
Your register, as you rate it

The dots are your risks, placed on the likelihood and impact you have just given them. This is your INHERENT appraisal, before barriers: the residual, which accounts for your controls and their testing, is computed for the report.

1234512345LikelihoodImpact1
Your risks

Likelihood — how often

Impact — what consequence

The barriers in place

The three timings

What you decided to do about it

Steering of the treatment

Specific to the public sector

Your arrangement, beyond the register

The eight components of clause 5 of ISO 31000. They are what make an arrangement last instead of living for the span of a workshop.

This tool does NOT assess your risks for you: it assesses the way you assess them. The likelihoods, impacts and barriers are the ones you declare, and a risk left out will appear in no computation — that is the limit of any register, and the reason identification is done in a workshop, with the business, and not alone in front of a screen. The barrier-effectiveness coefficients are a convention of this tool, written into the report and therefore open to challenge. They come from no standard: ISO 31000 asks for a residual, it does not say how to quantify it. The impact bands offered are to be adopted or adjusted by your organization, which alone defines its risk criteria. Finally, the tool does not address the PLAUSIBILITY of your estimates: three people rating the same risk 2, 3 and 5 will get three different reports, all internally consistent. That is exactly what rating in an adversarial workshop is there to correct.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 28

Organization development: running it and making it last

Does your change effort follow an order that holds, and will anything remain afterwards?

This tool does not assess your organization — six other tools on this site do. It assesses the CONDUCT of your change effort: its sequence, the level at which it acts, and what will remain when it stops. Most efforts that fail did not fail on the quality of the diagnosis: they skipped a step, swapped two, or acted one level too low.

An activity, never an organization’s name: the tool receives no identity.

Where each step stands

The order matters as much as the content. Answer on the actual state, not the intention: it is the gap between the two that the effort will pay for.

1. Entry and contracting

Establishing who the client is, what is asked for, what is not, who decides, and what each side brings.

2. Data gathering

Interviews, questionnaires, observation, documents: material is gathered, and those who provide it are told what will become of it.

3. Feedback to the people who answered

The data goes back to those who provided it, before any decision. It is the act that defines the discipline.

4. Shared diagnosis

The problem statement is co-signed: the client recognizes it as their own, including the part that implicates them.

5. Designing the interventions

Choosing at which level to act and by what means, and writing it with those who will carry it out.

6. Implementation

The interventions run, and their actual delivery is tracked — not just their schedule.

7. Evaluation

Two distinct evaluations: of the IMPLEMENTATION, which says whether what was planned took place, and of the RESULTS, which says what it produced.

8. Institutionalization

The new way of working becomes the way of working: it enters the procedures, the objectives, the induction of newcomers.

The three levels

On the same scale, so the gap shows: where the problem plays out, where your interventions act, and where your sponsor can decide.

At which level the problem actually plays out

At which levels your interventions act

Which level the effort’s sponsor has authority over

Clarifying roles within the team, working rules, routines, collective problem solving.

Measurement, and what it will let you assert

With no measure taken BEFORE, no claim of effect is possible — neither in your favor nor against you. It is the least negotiable rule in this tool.

What will remain when the firm leaves
Where the institutionalization stands

The steps appear in this order: you do not prefer a way of working you do not practice. Tick the ones reached, not the ones wished for.

This tool does NOT assess your organization: it assesses the conduct of your effort. A perfectly run effort on a wrong diagnosis will produce nothing, and the tool cannot see that — which is why it examines the sequence and not the content. The steps and their order come from the organization-development literature, which is a discipline and not a standard: there is no enforceable text, and an effort may legitimately depart from the sequence if it knows why. What the tool flags are the departures whose cost the literature documents. The baseline-measure rule is the hardest and the least negotiable: with no measure taken beforehand, no claim of effect is possible, neither for the effort nor against it. A firm that announces a result with no starting point is announcing an impression. Finally, the institutionalization steps are declared by you. The “they prefer it” step is the one sponsors most overestimate: it is verified by withdrawing attention, not by asking.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

TOOL 29

Multi-criteria decision support

Requirements that eliminate, weighted criteria, and a choice whose margin and strength are known.

Three stages, in this order. First what is required: a requirement is judged yes or no, and an option that misses one leaves the choice. Then what is desired: criteria, and the weight of each — set before looking at the options. Finally the options, rated criterion by criterion. The tool then says which one wins, by how much, and what would have to change for the order to flip.

The decision

If you were wrong

The options on the table

At least two. A decision that examines a single option is a “go or no go”, and those decisions fail more often.

Requirements — what is required

Optional. A non-negotiable condition: a legal obligation, a voted budget, a safety requirement. Tick the options that meet it.

Criteria — what is desired

Two to seven. Set them, with their weights, before looking at the options in detail.

How to weight

Your weights

total cost33 %
time to implement33 %
quality of service33 %
Rating the options

For each option, one rating per criterion: from very poor to excellent.

Option A

total costAcceptable

time to implementAcceptable

quality of serviceAcceptable

Option B

total costAcceptable

time to implementAcceptable

quality of serviceAcceptable

1 : very poor · 2 : poor · 3 : acceptable · 4 : good · 5 : excellent

How the decision was prepared

This tool does not make the decision: it makes explicit the one your criteria, weights and ratings imply, and it says whether it holds. The result is only as good as those three inputs — ratings given by a single person, after seeing the options, reproduce that person’s preference instead of testing it. The method follows established references: separating requirements from desired criteria (Kepner and Tregoe), direct weighting or pairwise comparison with its consistency ratio (Saaty), and the additive model of multi-criteria decision analysis (Keeney and Raiffa). The reading thresholds — a thin margin, a fragile ranking — are conventions of the firm, written into the report so they can be discussed. The additive model assumes that a good result on one criterion can offset a weaker one on another: that is precisely what requirements prevent for what is not negotiable. A decision with an aspect that cannot be offset should declare it as a requirement.

Your answers are sent securely to NAITECH Consult to prepare your preview; they are kept only if you request a quote.

Frequently asked questions

Does an organizational diagnosis necessarily lead to job cuts?

No. Most of the diagnoses we conduct reveal problems of process, information flow or workload distribution — not overstaffing. When overstaffing appears, we say so, but it is not the default conclusion.

Why is change management a separate service and not an option?

Because a reorganization without support generally returns to its starting point in eighteen months, once management's attention has moved elsewhere. Embedding is worked at, not decreed.

How long before a measurable effect?

The first effects on operational indicators (delays, complaints) generally appear between three and six months after the new processes are deployed, provided the change support runs its course.

Do you work on one department, or must the whole organization be addressed?

A specific department or process is a perfectly defensible starting point, particularly if a malfunction is clearly identified there. Many engagements start that way before extending.

The other practices

Let's talk about your project

Human capital, training, organization, governance, compliance or artificial intelligence — our teams support you in Morocco and internationally.